The building was built in 1994, the three-room apartment is on the 4th floor, 74m. sq. The entrance has a concierge and video surveillance. Major repairs were made in September 2023: all sewers, water pipes, and electrical wiring were replaced (a modern switchboard for 26 machines was installed, when the power is turned off, you can connect to the network)