Residential complex "Orange City". The rough work has been done: electricity, plumbing, heated floors, plastering the walls, leveling the floor throughout the entire apartment to one level, glazing the skylight, remodeling, building a shower tray, and laying down the shower, installing a toilet. The lines of 2 air conditioners have been laid, external units have been installed, and there are already internal units with Wi-Fi modules. All holes after the developer have been filled and recessed.