They built for themselves. There is a basement (a bomb shelter). Land 8 hundred. (actually more). The first floor is 90% renovated. Warm floor. All that remains is to paint the walls and place the furniture. Second floor: everything is prepared for repair, all communications are removed. Overlap - panels. Double septic tank with overflow. The well is 28 m. 13 kW of electricity is installed, it can be overclocked. Copper wiring. Waterproof foundation and floor. The roof is a metal tile (minwat in