DIVISION center, Khoriva, 5th floor was added in 1990 during the overhaul of the house, dry roof, H = 2.75 m, all separately, cosmetic repairs (made: plaster, sandstone, electricity, wallpaper for painting, parquet, tiles on kitchens installed: plastic windows and doors to the balcony KVE (Germany) with 2-chamber double-glazed windows, air conditioning, gas stove with electric oven, hood, new pipes, water and gas meters, outlets for boilers, armored doors, cast iron batteries.